WHAT'S NEXT:

ON-SITE TESTING

Safety, accuracy, and attention to details. 

OUR WELL-TRAINED AND HIGHLY EXPERIENCED TEST TEAMS WILL complete ON-SITE TESTING.


  • ​​Use advanced acoustic monitoring to           acquire test data on:

      - The normally closed valve
       with and without pressure, or

      - On, upstream, and downstream of the valve.


  • Make initial conclusions, including:

      -"Leak" versus "tight" analysis, and

      -Internal damage assessments
     

  • Note external conditions & safety concerns,       such as: 

      -A valve stuck open, missing handwheel,              a packing leak, etc.


  • Conduct post-testing exit meeting.